RFT2026-003 Design and Construct Floodway - Chinner Road
Buyer lockedTL-2658x251909via TenderLink
Scope of works
COOMALIE COMMUNITY GOVERNMENT COUNCIL. RFT2026-003 DESIGN AND CONSTRUCT FLOODWAY - CHINNER ROAD. Public Tender RFT2026-003 Design and Construct Floodway – Chinner Road is now open. Documentation is...
A plan unlocks the full scope and the buyer behind it.
More open Civil & Roadworks tenders in Northern Territory
Tender T26-1224 Department of Logistics and Infrastructure Upgrade and seal of the Sandover Highway from 170 km to 182 km. The upgrade is to establish a 9.0m wide two-lane sealed carriageway on a 9 m wide formation within the extents of the current road alignment. The length of works consists of 1 two cell culvert, 5 floodways (All spray-sealed), 2 intersections, and the replacement of one existing cattle grid with a new cattle grid, including approach slabs, rails and width markers (as per CS3313 and CS3315). Civil Closing 23/11/2026 02:00 PM ACST Current
NTCivil & RoadworksCloses in 5 hMon, 23 Nov, 4:30 pm ACST
Tender T25-1519 Department of Logistics and Infrastructure A general outline of the work to be carried out under the Contract comprises of upgrading and sealing approximately 15km of unsealed road as shown on the Contract Drawings. The scope includes, but is not limited to:· Upgrade of unsealed road to a sealed single carriageway standard from Ch 31800m to 46811m;· Installation of reinforced concrete box culverts and pipes at various locations;· Road re-alignments at various locations;· Construction of intersections and light vehicle accesses at various locations;· Tie into existing sealed road near the ‘Threeways’ intersection;· Construction of roadside drainage and protection works; · Spray sealing (14mm primerseal / 7mm S10E);· Pavement marking and installation of road furniture, including road safety barriers;· Gravel transition to the existing unsealed road from Ch 31500m to 31800m;· Rehabilitation of site, including all disturbed areas such as old road alignments, gravel pits, campsite, laydown areas, access roads and turn-around areas.Note that works between Ch 30300m and 31500m, including Access 20, are not included in the Contract. Civil Closing 25/11/2026 02:00 PM ACST Current
NTCivil & RoadworksCloses in 53 hWed, 25 Nov, 4:30 pm ACST
Quote T26-1315 Department of Logistics and Infrastructure A general outline of the work comprises of the manufacture, supply and installation of two (2) bespoke trail signs and associated civil and landscaping works at Alice Springs Telegraph Station (ASTS) and Redbank Gorge (RB), in accordance with the Contract drawings, specifications and other Contract documentation.The works shall be undertaken sequentially, commencing at Alice Springs Telegraph Station. All works at this location are to be 100% complete before commencing works at Redbank Gorge. Building Closing 26/11/2026 02:00 PM ACST Current
NTCivil & RoadworksCloses in 3 daysThu, 26 Nov, 4:30 pm ACST
Tender T26-1360 Department of Logistics and Infrastructure Undertaking the traffic management duties in accordance with this specification, the Australian Standards 1742.3, the Austroads Guides for Temporary Traffic Management and the NTG standard clauses for Provision for Traffic.It involves the provision of traffic control services in the following separate circumstances:• Urgent work for traffic control at emergency response incidents, 24 hours a day, 7 days a week including public holidays.• Scheduled work for Special Events traffic control (e.g. – planned or unplanned events).• Scheduled work for traffic control at specific locations (e.g. – Requests due to follow ups relating to incident management).• Development of Traffic Management Documents for NTG use.• Provision of devices like mobile lighting towers and variable message signs (VMS) for urgent works. Civil Closing 26/11/2026 02:00 PM ACST Current
NTCivil & RoadworksCloses in 3 daysThu, 26 Nov, 4:30 pm ACST
Tender T26-1251 Department of Logistics and Infrastructure Description – A general outline of the work:Bituminous repairs and minor rehabilitation of existing roads, car parks, cycleway and footpaths.Pothole/delamination Patching:Provide seasonal road inspections to log pothole/delamination defects within prescribed intervention levels on all road assets (excluding pathways).Automatic approval to repair pothole/delamination defects.Performance based requirements to ensure pothole/delamination defects are repaired within nominated response times on all assets.Other works shall be ordered by DIPL through the CSR system:Edge Break Repairs Regulation PatchingReconstruction PatchingSpray Sealing – Hot BitumenMinor reconstruction with surface worksOther related works as determined by the Superintendent. Civil Closing 26/11/2026 02:00 PM ACST Current
NTCivil & RoadworksCloses in 3 daysThu, 26 Nov, 4:30 pm ACST